Design cost estimate:
Rationale:
Prototype materials cost estimate:
Rationale:
Design cost estimate: $3000
Rationale: Since the GVCS tools necessary to do everything in-house don't exist yet, some outside tooling and services will be required. Since the presumption is that this will be an all-volunteer project, there will be no inside labor costs. Since software and hand tools are unlikely to wear out during the execution of the design, there are no other design costs of significance.
Prototype materials cost estimate: $12,000
Rationale: That's what is listed in the specs on http://opensourceecology.org/wiki/Open_Source_Car/Research_Development, "Low cost (less than $12,000)". Since it's possible to add features to a car, up to any budget, it will all get spent. Since there's no place to list other prototype construction expenses I'm including shop space and lighting for 8 months @ $250 per month, leaving ten grand specific for materials...but I'm also estimating based on if I were doing this project, and since I'm already in the car component biz, I get pretty good breaks on some of the essential components. At the OSE HQ, the shop space would be less expensive but components more expensive so I figure it's a fair guess at either location.
>If you have any credentials that would add validity to the estimate, please add them as well.
Oops, I missed this part. I lack academic creds but have developed/produced a car that fits the specs (two seat, inexpensive, high efficiency, low cost, and of course, open source) so I figure I can do it again.
Go to www.kineticvehicles.com and click the spot on the left that sends you to my Mother Earth News blog, "MAX Updates"
It looks like you're new here. If you want to get involved, click one of these buttons!